|
Meteor
Showers, Olympics, Inauguratoins
Big Event Only Happen Every Few Years
Three years after the last such giant
CONEXPO/CONAGG affair in Las Vegas, its
time again in March 2005with expectations
this time of 2,300 exhibitors covering 1.85 million
sq ft. You get an idea of the foreign participation
from the registration and housing forms being
offered in 10 languages.
Build
America Awards to be Presented at ConExpo
Associated General Contractors (AGC) and Aon Construction
Services Group will join forces at the AGC Convention
to honor the best of the best with
the presentation of the Aon Build America Awards.
AGCs 86th annual convention will take place
during ConExpo, March 14 - 18, 2005, in Las Vegas,
NV, at the Bellagio Hotel & Casino.
Roundtable
>>
Moving
Fast in Las Vegas
On a tight schedule with its 26-story Caesars
Palace II under third quarter 2005 deadline in
Las Vegas, Perini Building Co. chose Conesco Doka
to supply customized self-climbing formwork.
Enterprise
Estimating
The next generation construction estimating
solution is here: designed and built by in-house
BID2WIN programmers, BID2WIN 2005 allows an unlimited
number of estimators to work on the same bid at
the same time with no performance degradation.
Advanced
Estimating Anytime
Anywhere
For nearly 40 years, MC2 has pioneered
the use of computers in construction cost estimating.
Dispatching
with Ease and Flexibility
Keeping track of equipment and employees is easy
with The Dispatcher by HCSS.
Wastewater
Plant's Bypass Solution
When Bowen Engineering Corp. of Fishers,
IN, needed to keep the Southport Advanced Wastewater
Treatment Plant of Indianapolis online during
a critical expansion, it turned to Godwin Pumps.
|