| BID/PROPOSAL DATES 10/08/2008
CALIFORNIA 10/21 California State University at San Marcos, 441 La Moree Rd., San Marcos 92096-0001, a new social and behavioral sciences building at 333 S. Twin Oaks Valley Rd. in San Marcos. The estimated $44.3-million project includes construction of a new four-story, 106,509-sq-ft building. AC Martin Partners, architect, 444 Golden Shore St., Long Beach 90071-2913. DR #07-769348.
INDIANA 10/21 Greater Clark County School Corp., 2112 Utica Sellersburg Rd., Jeffersonville 47130-8506, Charlestown High School located at One Pirate Place in Charlestown. The estimated $44.9-million project includes 190,000 sq ft of new construction and 73,000 sq ft of renovation work. The Estopinal Group Inc., architect, 903 Spring St., Jeffersonville 47130; Whittenberg Construction Co., 4774 Allmond Ave., P.O. Box 9429, Louisville 40209, is construction manager. DR #06-795791.
CALIFORNIA 10/22 (design-build)-U.S. Naval Facilities and Engineering Command, 1220 Pacific Highway, San Diego 92132, bachelor enlisted quarters (BEQ) at Camp Pendleton Marine Corps Base. With cost estimated between $100 million and $250 million, the project includes four new BEQs and renovation of three administration buildings. Point of contact: Erica Sist, (619) 532-1377. DR #08-76503.
CALIFORNIA 10/22 San Leandro Unified School District, Purchasing Dept., 14735 Juniper St., San Leandro 94579, San Leandro 9th Grade campus at Bancroft Ave. and 138th St. The estimated $27.7-million project consists of construction of a three-building, 67,000-sq-ft campus, including one classroom building, a kitchen building and a gymnasium building, as well as associated site improvements. WLC Architects, 1250 45th St., Emeryville 94608; Harris and Associates, 14735 Juniper St., San Leandro 94579, is construction manager. DR #08-622902.
FLORIDA 10/22 (qualifications for construction management at risk)-Orange County School Planning & Construction, 6501 Magic Way, Building 100B, Orlando 32809, addition and renovation of Walker Middle School at 150 Amidon Lane in Orlando. The estimated $29.3-million project includes approximately 68,000 sq ft of new construction and 118,000 sq ft of interior demolition, renovation and remodeling existing buildings. Rhodes + Brito Architects Inc., architect, 601 N. Magnolia Ave., Orlando 32801. DR #08-698581.
ILLINOIS 10/22 City of Chicago, Dept. of Purchases, 121 N. La Salle St., Room 301, Chicago 60602, improvements to bridge structures at O'Hare Airport. Estimated to cost between $15 million and $25 million. Point of contact: Richard Sanchez, (312) 744-8212. DR #04-718781.
NORTH CAROLINA 10/22 Buncombe County Commissioners, 46 Valley St., Asheville 28801, expansion of Buncombe County Human Services Building, including a parking deck at 40 Coxe Ave. in Asheville. The estimated $22-million project includes an eight-tier, 240,000-sq-ft parking deck and a five-story, 49,500-sq-ft addition to the existing building. Keith Hargrove Architect PLLC, architect, 795 Merrimon Ave., Ashville 28804. DR #08-796445.
RHODE ISLAND 10/22 State of Rhode Island, Dept. of Administration, Division of Purchases, One Capitol Hill Plaza, Second Floor, Providence 02908, addition and alterations to the Rhode Island School For the Deaf classroom building at One Corliss Park in Providence. Work is estimated to cost $25 million. Robinson Green Beretta Corp., architect, 50 Holden St., Providence 02908-5757. DR #05-801627.
ALABAMA 10/23 (prequalified bidders)-Auburn University, Facilities Design and Development, Building 2, Training Room 113, Auburn 36830, phase 2 of Transportation Technology Center on Auburn University campus. The two-story, 175,000-sq-ft project is estimated to cost $40 million. HOK Inc., architect, 235 Peachtree St. N.E., Suite 500, Atlanta, Ga. 30303; Hoar Construction Co., Two Metroplex Dr., Suite 400, Birmingham 35209, is construction manager. DR #08-774076.
CALIFORNIA 10/23 Pittsburg Unified School District, 2000 Railroad Ave., Suite A, Pittsburg 94565, Pittsburgh High School reconstruction and modernization project at 250 School St. The estimated $75-million project consists of 243,000 sq ft of new construction, including a two-story classroom building, a new tilt-up concrete gymnasium, and modernization, demolition and abatement work. California Design West, architect, 2100 19th St., Sacramento 95818. DR #08-578444.
TEXAS 10/23 (statement of interest and qualifications from construction managers)-City of Round Rock, 221 E. Main Ave., Round Rock 78664, phase one of the Brushy Creek Regional Water Supply project to serve the Cities of Leander, Cedar Park, and Round Rock. Phase one is estimated to cost $160 million. Each subsequent phase will consist of construction of new or expansion features, such as water-intake structures, water-treatment plants, raw-water and treated-water pipeline segments. Engineers are: Camp Dresser & McKee Inc., 12357-A Riata Trace Parkway, Austin 78727; Jacobs Carter & Burgess Inc., 2705 Bee Caves Rd., Austin 78746; HDR Engineering Inc., 4401 W. Gate Blvd., Austin 78745; K Friese & Associates Inc., 1120 S. Capital of Texas Highway, Building 3, Suite 100, West Lake Hills 78746; and LAN Lockwood Andrews & Newman Inc., 3420 Executive Dr., Austin 78731. DR #06-649160.
|