The Cummins line of diesel generators can now be integrated into remote infrastructure elements such as sewage lift stations (photo right). The generator is part of a pre-engineered lift station, and is able to supply backup power to pump controls, submersible pumps and communication equipment. It features open transition transfer switches for smooth transfer to grid power and back again, allowing for continuous operation during outages. Cummins; 800-888-6626; www.cumminspower.com.
Flexible Welding: Quick Changes
The Tough Gun 2122 MIG welding guns now feature the Quick Load 2122 Gooseneck System, which allows quick adjustment of the welding angle for reaching awkward joints and working in tight spaces. A quick-release latch enables fast switching of different gooseneck styles, and for the neck to be rotated 360 degrees. The Quick Load Liner system allows a new liner to be installed from the front, taking less time than a full liner installation. Tregaskiss; 877-737-3111; www.tregaskiss.com.
Please email press releases for new products to ENR's Products Editor at ENR_products@mcgraw-hill.com
. If possible, attach a low-res color image.
Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.
For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.
Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.