subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Mcgraw Hill Construction
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Mark Silveras Movable Feat Rescued City Creek Development

Text size: A A
[ Page 1 of 2 ]
City Creek's two-block-long retractable skylight (image, below) is considered one of the most complex kinetic structures.
Courtesy of Uni-Systems
----- Advertising -----

Thanks to his movable feat on high, Uni-Systems' Mark Silvera is a behind-the-scenes linchpin of City Creek, Salt Lake City's 23-acre urban redevelopment.

SILVERA

Most eye-catching in the mini-village is a 470-ft-long bi-parting skylight that, from below, "disappears" from sight. Covering a pedestrian shopping street, the gently curved skylight ranks among the most complex kinetic structures.

Mechanized-architecture consultant Uni-Systems initially had lost its bid to engineer the skylight. But the firm got a second chance when the winner opted out of the job. Silvera, who was not involved with his firm's first bid, was asked to improve upon the early schemes and bring down Uni-Systems' original price.

Early concepts called for the skylight panels to retract almost fully before they curtsied, but that introduced excessive forces and other complications, says the senior project engineer and manager.

His idea was to tip the panels as they retracted on travel rails using upwardly sloped back spans, which spread out the forces and reduced power needs. "Our price came down several million dollars from our original estimate," says Silvera.

Calling the skylight his most demanding job ever, Jeremy Jenkins, managing director at steel fabricator Ducworks Inc., Logan, Utah, says he was quite thankful for Silvera's willingness to "jump in, roll up his sleeves and tackle whatever challenge" came up in the shop.

Others echo Jenkins' sentiments, saying Silvera's leadership produced exemplary results. The proof is in the pudding: The skylight has been operating successfully since City Creek opened last March.

 

Keywords:

[ Page 1 of 2 ]
----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.