subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

GOVERNMENT/PUBLIC BUILDING: Chandler City Hall

Text size: A A
Photo by Bill Timmerman Photography
Best Government/Public Building: Chandler City Hall
----- Advertising -----

Chandler City Hall

Chandler, Ariz.  Region ENR Southwest

Project Team

Owner City of Chandler

Architect SmithGroup Inc., Phoenix

General Contractor Sundt Construction, Tempe, Ariz.

Engineers Dibble and Associates, Phoenix; Caruso, Turley and Scott, Tempe

An elegant design, highly detailed construction plan and integral community involvement were just a few of the reasons judges raved about the first city hall built for this Phoenix suburb. An LED-lit kinetic sculpture graces the front of a six-story office tower that is supported laterally by unusual cast-in-place, exposed concrete K-braces. Of all the LEED Gold-certified building's sustainable features, none is more visible than the parking garage's waterfall, which aids in cooling the mechanical system's condensate water and irrigates the xeriscaping. Using lean construction scheduling methods along with building information modeling made available on the jobsite via tablet-based mobile office devices, the project team shaved almost $4 million from the original budget.

Keywords:

----- Advertising -----
Video
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.