Chandler City Hall
Chandler, Ariz. Region ENR Southwest
Project Team
Owner City of Chandler
Architect SmithGroup Inc., Phoenix
General Contractor Sundt Construction, Tempe, Ariz.
Engineers Dibble and Associates, Phoenix; Caruso, Turley and Scott, Tempe
An elegant design, highly detailed construction plan and integral community involvement were just a few of the reasons judges raved about the first city hall built for this Phoenix suburb. An LED-lit kinetic sculpture graces the front of a six-story office tower that is supported laterally by unusual cast-in-place, exposed concrete K-braces. Of all the LEED Gold-certified building's sustainable features, none is more visible than the parking garage's waterfall, which aids in cooling the mechanical system's condensate water and irrigates the xeriscaping. Using lean construction scheduling methods along with building information modeling made available on the jobsite via tablet-based mobile office devices, the project team shaved almost $4 million from the original budget.


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.