British Columbia will move forward with the development of a new, 900-MW, $6.6-billion hydroelectric project on the Peace River in the province’s eastern section, Premier Gordon Campbell announced on April 19. As currently designed, the earthfill Site C dam would be 1,100 meters long, with 300 meters of concrete structures located on the right bank for the spillway and power intakes. The Sierra Club of British Columbia criticized the decision on the dam, calling it an “ill-advised” mega-project that fails to meet minimum international standards for large dam construction.
Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.