subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Dodge Data & Analytics
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Central Asian Rail Link Will Redirect Export Paths

Text size: A A
Map by ENR
The North-South Transnational Corridor project aims to be the most direct link for freight shipments from Russia or Central Asia to the Persian Gulf.
----- Advertising -----

 

Project: North South Transnational Corridor

Cost: $1.4 billion

Construction period: 2007-2012

Central Asian nations have been slow to establish rail links with their neighbors to the south for numerous reasons. During the era when the Central Asian nations were part of the Soviet Union, all their rail lines headed north to Russia, their major trading partner.

Of the five Central Asian nations, Kazakhstan occupies an especially strategic position. Geographically, it lies between China to the east and Russia to the north and west; it also provides a north-south corridor between Europe and the Middle East and southern Asia. Politically, Kazakhstan has maintained good relations with its larger neighbors—Russia, China and Iran—which has involved a skillful balancing act.

The North South Transnational Corridor project aims to be the most direct link for freight shipments from Russia or Central Asia to the Persian Gulf. It will run from the rail junction of Usan in western Kazakhstan in a southerly direction, crossing the Karakum Desert in Turkmenistan and linking up with an existing rail line in northern Iran. The line will run for 137 kilometers in Kazakhstan, 470 km in Turkmenistan and 70 km in Iran.

An agreement to build the line was signed by the presidents of Kazakhstan, Turkmenistan and Iran in 2007. Turkmenistan began construction at Bereket station almost immediately. By July 2010, about 300 km of the line in Turkmenistan was completed; the work was performed by Iranian contractors. Turkmenistan’s effort was primarily financed by the Asian Development Bank. But Kazakhstan has delayed its start, citing financial reasons.

According to the Far News Agency in Iran, the Iranian minister of roads and urban development, Ali Nikzad, announced that the portion of the corridor within Turkmenistan that is being built by Iranian contractors will be completed by the end of 2011. The short link inside Iran, which is being built by the Iranian contractor Pars Enerzhi, will be completed by March 2012.

Once it is completed, the railway is expected to initially transport cotton from Turkmenistan, as well as agricultural products and oil from Kazakhstan and Turkmenistan, to ports in Iran’s Persian Gulf for export to world markets. The new line will cut 600 km from the current route for shipped cargo from the Central Asian nations to Persian Gulf nations, putting the markets of Iran and the Gulf Arab states within cost-effective reach of, for example, Kazakh food producers.

Ultimately, the railway could shorten by 1,000 km the distance for shipping Chinese cargo to Europe via the Trans-Siberian Railway by routing it over the new rail link and existing lines through Iran and Turkey.

Keywords:

----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.