A temporary bridge will take shape this year to carry segments of new self-anchored suspension span until cable arrives.
Photo: Granite Construction
Project of the Month: A Highway Through Key Largo
The old bascule span, which had been demolished, is open in the foreground while the crane barge used for setting four spans of beams works behind the roadway on the right. The bascule was much lower than the new structure and had to be drawn up during hurricanes.

View Related Story

Close window