subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Mcgraw Hill Construction
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Tunnel Option Is Top Choice for Seattle’s Viaduct Replacement

Text size: A A

The nearly decade-long fight over whether to raze or rebuild the Alaskan Way Viaduct on Seattle’s waterfront is nearing a final decision. On Jan. 13, Washington Gov. Chris Gregoire (D) announced that she favors replacing the 55-year-old highway with a $4.25 billion deep-bored tunnel. King County Executive Ron Sims, Seattle Mayor Greg Nickels and Port of Seattle Chief Executive Officer Tay Yoshitani also support the plan. Elected officials have been debating whether to rebuild or replace the viaduct since 2001, when the double-deck freeway was damaged in an earthquake. A month ago, an advisory committee created to study design options for replacing the structure proposed building a six-lane boulevard or a reconfigured elevated highway. But business leaders and environmentalists opposed those choices and pushed for the tunnel. The two-mile, four-lane tunnel is the most expensive of the various design options. The current project budget is $430 million short. Lawmakers are evaluating several methods to help pay for the tunnel, including charging tolls.

Tunnel Option Is Top Choice for Seattle’s Viaduct Replacement
Photo: Washington State Department Of Transportation
Tunnel Option Is Top Choice for Seattle’s Viaduct Replacement
----- Advertising -----

 

----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.