subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Mcgraw Hill Construction
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Post-Drilling Watertreatment

Text size: A A

TerrAqua Resource Management's (TARM) new treatment facility in Williamsport, Pa., for wastewater generated from hydrofracking, well development and production was the first of its kind in Pennsylvania and required the firm, a subsidiary of Williamsport, Pa.-based Larson Design Group, to obtain a special “beneficial re-use permit” from the Pennsylvania Dept. of Environmental Protection.

< The custom facility contains 96 “frac” tanks to store and keep separate the watercoming from different clients.
Photo: Courtesy of TARM
The custom facility contains 96 “frac” tanks to store and keep separate the watercoming from different clients.
----- Advertising -----

LDG principal Marty Muggleton says TARM saw a need that local sanitary authorities had trouble meeting and stepped in with a solution specifically for the natural-gas and oil industry. He says the flowback and produced water from Marcellus shale development has a higher salt content that is “disruptive” to the biological treatment systems at most local facilities to treat industrial wastewater.

As a result, TARM built an 80,000-sq-ft facility to treat flowback and produced water using chemical processes and by adjusting pH levels, which typically are more successful in treating the water from fracking, Muggleton says. “It is very straightforward. Nothing we have is proprietary,” he says.

What sets the facility apart, Muggleton says, is the 96 separate “frac” tanks, each capable of storing up to 21,500 gallons of water. The tanks keep different clients' water separate, so the water is never commingled; the trucks leave with the same—but treated—water with which they arrived.

Muggleton says the TARM process benefits not only Marcellus shale development but also mitigates environmental impacts through reuse of water resources, reducing the carbon footprint and impacts on local roadways with fewer truck trips.

TARM has plans to build at least two additional facilities in Pennsylvania and is eyeing opportunities at other shale plays across the nation, including the Eagle Ford play in Texas. Although a facility like TARM's would not be economical at shale plays near abundant sources of water, it could be useful where recycling of the generated water becomes optimal, Muggleton says.

 

----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.