Calgary, Alberta-based TransCanada said on Jan. 26 that it has contracted with enough companies to proceed with the 1,980-mile Keystone XL pipeline. It would be the first to transport crude oil from Canada’s oil-sands region to refineries on the U.S. Gulf Coast. The proposed $12-billion, 36-in.-dia pipeline could move up to 150,000 barrels of oil per day. Together with the existing Keystone pipeline, the two lines would move up to 250,000 bbl daily. The project, which is contingent on U.S. State Dept. approval, is opposed by several environmental and local groups. The American Petroleum Institute says the pipeline is “a matter of critical national interest” to lessen U.S. dependence on other oil sources. If approved, TransCanada says the pipeline could be in service by the first quarter of 2013. It contends that the pipeline would boost the price of Canadian oil-sands crude by $3 per barrel due to additional refining.
Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.