subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Mcgraw Hill Construction
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Link From Canada Oil Sands to Gulf Coast Refineries Proceeds

Text size: A A

Calgary, Alberta-based TransCanada said on Jan. 26 that it has contracted with enough companies to proceed with the 1,980-mile Keystone XL pipeline. It would be the first to transport crude oil from Canada’s oil-sands region to refineries on the U.S. Gulf Coast. The proposed $12-billion, 36-in.-dia pipeline could move up to 150,000 barrels of oil per day. Together with the existing Keystone pipeline, the two lines would move up to 250,000 bbl daily. The project, which is contingent on U.S. State Dept. approval, is opposed by several environmental and local groups. The American Petroleum Institute says the pipeline is “a matter of critical national interest” to lessen U.S. dependence on other oil sources. If approved, TransCanada says the pipeline could be in service by the first quarter of 2013. It contends that the pipeline would boost the price of Canadian oil-sands crude by $3 per barrel due to additional refining.

----- Advertising -----
----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.