The first of two record-breaking tunnels on Switzerland’s twin-bore, 57-kilometer-long Gotthard Alpine rail crossing broke through on Oct. 15. The breakthrough finishes the east drive of the Gotthard twin tunnels, which are among several being built through the Alps. The west tunnel’s breakthrough is scheduled for next spring. The joint-venture Tunnel AlpTransit Ticino (TAT) made the breakthrough at the tunnel’s midpoint, connecting to the awaiting “Sedrun” stretch. The tunnel is expected to start rail operations in late 2017 at an estimated cost of $10.3 billion.


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.