subscribe to ENR magazine subscribe
contact us
advertise
careers industry jobs
events events
FAQ
Mcgraw Hill Construction
ENR Logo
SUBSCRIBE TODAY
& receive immediate web access
comment

Landscape/Hardscape/Urban Development: Award of Merit

Text size: A A
Photo by Dave DiCello
Point State Park Renovation, Phase 4
----- Advertising -----

Due to long-term deterioration from severe flooding and other harsh weather, Pittsburgh's Point State Park—a National Historic Landmark—was in great need of renovation. The $35-million renovation of the 36-acre park included lawn and woodland restoration, wharf reconstruction, updating utilities and construction of a cafe.

The project's fourth and final phase focused on the Point Park fountain. A main goal was to upgrade the fountain's central water column system so that it could regain its peak height of 150 ft. Crews also installed a new 154-ft-dia inner basin ring that achieves an infinity-edge appearance between the fountain's pool and the nearby river.

Point State Park is surrounded on three sides by water and, on the fourth side, borders the city's business district. Interstate 279 also crosses overhead, further constraining access.

The park is the pre-Revolutionary War site of Fort Duquesne and Fort Pitt. Because of the park's landmark designation, crews had to take special precautions to protect historical artifacts.

The park, which hosts an average of three million visitors a year, had to remain open to the public throughout construction, even though nearly every surface was being renovated.

The renovation was the largest park project ever undertaken by the Commonwealth of Pennsylvania.

 

Point State Park Renovation, Phase 4, Pittsburgh

Key Players

Owner Pennsylvania Dept. of Conservation and Natural Resources

Design Firm Herbert, Rowland & Grubic

General Contractor S.E.T. Inc.

Structural Engineer Herbert, Rowland & Grubic Inc.

Civil Engineer Herbert, Rowland & Grubic Inc.

MEP Engineer H.F. Lenz Co.

Architect SMP Architects

Landscape Architect Pressley Associates Inc.

Aquatic Engineer Counsilman-Hunsaker

Geotechnical Engineer Geo-Mechanics Inc.

Water-Feature Specialist Crystal Fountains

Non-Profit Civic Group of Urban Planners and Designers Riverlife

Mechanical Contractor Wayne Crouse Inc.

Plumbing Contractor AMB, Inc.

Electrical Contractor Right Electric Inc.

Keywords:

----- Advertising -----
  Blogs: ENR Staff   Blogs: Other Voices  
Critical Path: ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings
Project Leads/Pulse

Gives readers a glimpse of who is planning and constructing some of the largest projects throughout the U.S. Much information for pulse is derived from McGraw-Hill Construction Dodge.

For more information on a project in Pulse that has a DR#, or for general information on Dodge products and services, please visit our Website at www.dodge.construction.com.

Information is provided on construction projects in following stages in each issue of ENR: Planning, Contracts/Bids/Proposals and Bid/Proposal Dates.

View all Project Leads/Pulse »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.