This $13.6-million facility includes a 22,000-sq-ft library and multiple conference rooms. Designers added light wells to introduce daylighting and provide a feeling of spaciousness. The majority of the building's finishes are exposed concrete, giving the building a slightly industrial feel, which is countered by the inclusion of fine millwork. Some systems were concealed within the concrete, while mechanical and electrical work was installed within access flooring rather than overhead. Further complicating the systems layout, the building's cast-in-place structural system was reversed, with the concrete beams being on top of the slabs. This tested the team to determine the best way to route the rough-in work. The project was completed early and under budget.
William O. Lockridge/Bellevue Library Washington, D.C.
Key Players
General Contractor: Coakley & Williams Construction, Bethesda, Md.
Owner: DC Public Library, Washington, D.C.
Lead Design: Wiencek & Associates, Washington, D.C.
Concept Design: Adjaye and Associates, New York
Structural Engineer: RESTL Designers, Washington, D.C.
Cast-in-Place Concrete: Oncore Construction, Washington, D.C.
Civil: Greenhorne & O’Mara, Germantown, Md.
Submitted by: Coakley & Williams Construction


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.