The 235,000-sq-ft, $93-million replacement school in Washington, D.C. was designed to accommodate a curriculum based on science, technology, engineering and math (STEM).
Facilities within the building include a proscenium theater, a natatorium, two gymnasiums and a media center with a television studio.
Designed to achieve LEED-Gold certification, its sustainable features include a green roof, rainwater harvesting system, high-performance glazing, super-insulated perimeter envelope, automated lighting controls, water-conserving plumbing fixtures and materials that emit low-volatile organic compounds.
The project Guaranteed Maximum Price was established with architectural drawings at 65% complete. Crews worked on a tight urban campus and delivered the facility in 14 months.
Howard D. Woodson High School, Washington, D.C.
Key Players
General Contractor: HESS Construction + Engineering Services, Gaithersburg, Md.
Owner: District of Columbia Public Schools/DGS, Washington, D.C.
Lead Design: Cox Graae + Spack Architects, Washington, D.C.
Structural Engineer: Adtek Engineers, Fairfax, Va.


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.