Lock and bridge reconstruction is a key component in a $1.4-billion master plan to secure the city’s major drinking water source, Improve mobility and reduce flood risks.
Lock and Bridge reconstruction is a key component in a $1.4-billion master plan to secure the city’s major drinking water source, improve mobility and reduce flood risks.
Florida Dept. of Transportation's use of alternative approach to building breakwaters that has proven more effective and less expensive is the first test by a state- or federal-level agency.
The building team for the WTC’s plain petite theater, known as PAC NYC, tackled architectural, structural and logistical challenges to build the 129,000-sq-ft performance venue, with three reconfigurable performance halls and an exotic translucent marble skin.
After snags and a redesign, the team working on arresting significant future settlement of the 645-ft-tall condominium tower has declared the $100-million fix a success.
The team that built the 230,000-sq-ft addition to the American Museum of Natural History pulled all the stops to create a lobby atrium that evokes a canyon.
One goal of the research is to identify optimum design patterns from native materials that can be used for 3D-printed horizontal construction at remote sites.